Main highlights of this edition:
- Ratification of the results of Transmission Auction No. 1/2026 and advances in the public consultation for Auction No. 4/2026;
- Regulatory advances for the integration of battery energy storage systems (BESS) into the grid;
- Approval of rules for financial compensation for constrained-off events affecting solar photovoltaic power plants;
- First-time activation of the Energy Surplus Management Plan for the Distribution Grid by the ONS;
- Exemption of small consumers from the prudential monitoring conducted by the CCEE;
- Advances in regulatory coordination on the national policy for pole sharing.
Read the full content: